What Commercial EV Charging Station Installation Involves in Charlotte, NC
EV charging station installation for a business is bigger than a home install. More chargers run at once for longer, so the building’s electrical service drives every decision. Every commercial job we do covers the same core pieces:
- A site survey picks the parking spaces, measures the runs from the electrical room and checks what the service can spare.
- Load management sizes the wiring to the managed load, which often lets 4 to 8 Level 2 ports run on the existing service.
- Level 2 chargers at 6.0 to 9.6 kW suit workplaces and public parking, where cars sit for hours at a time.
- Fleet EV charging uses Level 2 chargers up to 19 kW, and an 11 kW charger overnight covers more than 200 miles.
- Wiring an EV charger for parking lot spaces needs trenching or conduit from the building, plus mounts rated for outdoor use.
- Planning an EV charger for apartment building parking starts at about one Level 2 port for every 20 units.
- Duke Energy coordination starts early when the site may need a service upgrade or new service from Duke.
- The permit, inspection and schematic close out the job and feed straight into your Duke Energy credit application.